I finally stopped trusting the guy who said every panel needs its own ground rod, and it saved me two days
Six months back a helper on a job in Rochester kept telling me to drive a fresh ground rod at every sub panel, said he learned it from an old timer and it never fails. I took his word on a four building job and spent two full days hammering rods into hard clay, plus a couple hundred bucks in rods and clamps. When the inspector came out he just shook his head and asked why I was bonding everything to earth twice. Said if the panel is fed from the main service, one grounding electrode system handles it, and my extra rods weren't doing a thing for the trip path. He also pointed out that on one building I had the neutral and ground tied together at the sub, which is the actual thing that causes problems. I pulled every one of those rods back out, tied the sub panels to the main system the right way, and the inspection passed the next morning. If you hear a guy say "every panel needs its own rod" I would ask him to show you the code section before you buy anything. What is the worst piece of advice you got from a guy who sounded sure of himself?