The old timer at the hangar made me stop trusting my eye on wire routing
I was rewiring a comm panel in a Cessna 172 at our shop near Wichita and had the bundle running neat along the frame, thinking it looked perfect. An inspector with 31 years in the trade looked at it for about 10 seconds and said "it looks good, which is exactly the problem, where's your chafe margin?" I went back and found two spots where the loom was rubbing on a bracket edge that I'd never have caught just by eyeballing it. How many of you actually run the full separation check on every job, or do you trust the look of it like I did?