That mall job in Phoenix taught me to stop trusting the blueprints
The structural plans said the column was 4 inches further left than it actually was, and I laid 40 feet of brick before someone caught it. Foreman just shrugged and said 'surveyor was having a day.' Ever had to tear out a whole wall because the drawings were off?