Why does nobody talk about labeling both ends of every drop
I started labeling both ends of every drop about 8 months ago, and the pushback from the crew lead was loud. He said it slows the job and nobody reads tags anyway, so I tried it for a month on a 40-drop apartment building in Dayton to prove the point. We came back two months later for a dead line on the third floor, and the tag at the panel saved us from opening three walls, which would have cost $1,400 in drywall work. The lead still gripes about the extra 10 seconds per drop, but he hasn't ripped a tag off since. What do you all do on big closets, label everything or just the odd runs?