Found out a standard 2x4 is actually 1.5 by 3.5, and I've been framing for 9 years
I knew the nominal vs actual thing since my first week, but I never stopped to think about why the number shrank the way it did. A guy at the lumber yard in Modesto told me it was because they dried and planed it down from the rough cut, and it's been that size since the 60s. Did anyone ever work with true rough-sawn 2x4s and notice the difference in how they take a nail?