Can we talk about how a 3 inch drain slope ate up two full days on a garage slab
Back in 2019 I did a 24x24 garage pour in Phoenix and figured the drain would be a quick morning thing. Tbh that little 3 inch slope to the floor drain turned into almost two full days of fiddling because the mud kept working back uphill on me. My old boss used to eyeball the fall with a string and a torpedo level, and I tried that first and it was off by a good half inch across the run. Ended up setting screed pins every 2 feet and checking the fall with a laser, which felt like overkill at the time but it finally worked. Kids coming up now just punch the numbers into a rotary laser and it's done in 20 minutes. Ngl part of me misses the string trick and part of me is glad it's gone. What's the one job you still can't get fast no matter how many times you do it?