Chasing a 1/8 inch hump on a garage slab in Amarillo that turned into a 5 hour fight
Had a 24x30 garage pour last Friday and the middle of the slab had a low spot that was reading about 1/8 inch off under my 10 foot straightedge. I figured a quick pass with the bull float and a little extra mud would fix it, so I didn't think much of it at first. Ended up chasing that hump for close to 5 hours because every time I worked it, the mud would push to one side and the other side would fall. Turns out the base had a soft spot from a water line repair the homeowner never mentioned, so the slab was settling as we finished it. We finally cut out a 4x6 section, packed the base with a plate compactor, and re-poured that patch before the edges set up. Has anyone else run into a hidden soft spot under a slab that made you chase a finish way longer than it should have?